At AQUALIS, we know Summerville's sustainable water compliance standards and manage regulator relations for our clients.

It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to Summerville, South Carolina and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

Last Updated 08/06/2026

Summerville, SC Municipal Code

2.2.10 Stormwater Facility Ownership and Maintenance

2.2.10.1 Ownership

Commercial: In new and re-development projects, ownership of the entire stormwater system (conveyances, as well as all BMPs, ponds, etc.) shall belong to the owner, or a lessee(s).

For any project, the owner of a portion or the entire stormwater system, as the case may be, shall be clearly designated before a Construction Approval will be issued. Ownership shall also be recorded on the final plat. Ownership shall imply responsibility for maintaining the stormwater system, including all ponds and other BMPs used for controlling runoff quantity and quality. Ownership does not imply that the owner(s) may in any way alter the size, or function of any component of the stormwater system without consent from The Town of Summerville. Owners found altering such components will be required to remove any alterations.

2.2.10.2 Maintenance

Each component of the stormwater management system (pipes, inlets, BMPs) shall have a maintenance plan (activities and associated schedule) as part of the application package for a Construction Approval. The plan shall also cover temporary measures used during construction in addition to the long term maintenance of the system.

In addition, the owner/operator, HOA, or operator as applicable, must enter into a permanent maintenance agreement (Operating and Maintenance Agreement for Stormwater Facilities) with The Town of Summerville. This Agreement is a legal document, recorded in the permanent land records with the County Register of Deeds, in addition to being fully described on the final plat. The Agreement must be signed and executed prior to the issuance of a Construction Approval. This Agreement allows for maintenance to be performed by a third party such as an operator or other contractor. However, the owner must also be listed and is ultimately responsible for adherence to the maintenance requirements. The Town Engineer will provide oversight of these Agreements to ensure adherence by the owner or other responsible party. The Town Engineer will inspect a system as he deems necessary to ensure maintenance is being performed in accordance with this Agreement.

CHAPTER 4 – INSPECTIONS & ENFORCEMENT

4.1 Stormwater Management Inspections

Maintenance inspections will be performed on stormwater management systems and facilities throughout their useful life. For each system or facility installed or retrofitted during an approved construction project, the applicant must have submitted a maintenance schedule or plan. Town inspectors will be checking for adherence to this plan and any necessary changes that may arise after installation. Town inspections are not to be construed as a relaxation of the requirements on owners/operators to conduct self-inspection in accordance with any applicable local, state or federal stormwater requirements.

4.1.1 Inspector Duties/Responsibilities

The Town of Summerville’s Stormwater Management Inspectors shall inspect and enforce the requirements of the Town Stormwater Management Ordinance. The job duties/responsibilities of a Town Stormwater Inspector shall include, but not be limited to, the following:

1. Conduct and document construction site inspections to ensure compliance with the approved Town Approval or stormwater management plan. Frequency of inspections will be determined by Town staff on an as needed basis.

2. Ensure that the Town Approval or stormwater management plan, the SWPPP, and the construction plans are on the project site and are properly being followed and implemented.

3. Conduct post-construction inspections to ensure that permanent maintenance is being performed in accordance with the maintenance schedules for the various stormwater management facilities in the Town or approved stormwater management plan.

4. Provide the owner/operator of the project a written report within seven (7) days after every during construction or post-construction site inspection.

5. Issue enforcement orders, as necessary, to the owner/operator when any portion of the work does not comply with the Town Approval and/or stormwater management plan or work is occurring without appropriate Approval. The enforcement process and types of orders is detailed in Section 4.3.

6. Perform a final inspection upon the completion of the stormwater system to determine if the system is constructed in accordance with the Town Approval and/or, stormwater management plan.

7. Take immediate action if the owner/operator fails to comply with the Town Approval or the approved stormwater management plan and an imminent hazard exists as a result. The inspector should address the situation and notify any applicable local, state and federal agencies.

8. Maintain accurate and comprehensive project inspection files ensuring all relevant information is entered in the files to be maintained in the Engineering Department.

4.1.2 Inspection Process and Procedures

As per the Town’s Stormwater Ordinance, the Town Engineer or an authorized respresentative/designee (inspector) may enter upon all properties for regular inspections, periodic investigations, enforcement and to effectuate the provisions of the Ordinance. Upon refusal by any owner/operator or property owner to permit an inspector to enter upon the property or continue an inspection, the inspector shall terminate the inspection or confine the inspection to portions of the property to which no objection is raised.

Upon completion of a during construction site inspection, the Town inspector should, at a minimum, include the following in his inspection report to be provided to the owner/operator:

1. Date and location of the site inspection.

2. Whether the Town Approval or stormwater management plan, SWPPP, and construction plans have been properly implemented and maintained.

3. Identification of any approved plan or BMP deficiencies.

4. Any corrective actions needed.

Upon completion of a post-construction maintenance inspection, the Town inspector should, at a minimum, include the following in this inspection report to be provided to the owner/operator:

1. Date and location of the site inspection.

2. Whether the activities identified in the approved maintenance schedule have been properly implemented and completed.

3. Identification of any maintenance deficiencies.

4. Any corrective actions needed.

4.2 Owner Inspection Responsibilities

In accordance with any applicable local, state and federal stormwater requirements including, but not limited to, the NPDES Construction General Permit (CGP), owner/operators are responsible for conducting during construction and post-construction site inspections. Records of such inspections should be kept for a minimum of five (5) years and must be made available to the Town upon request.

4.3 Enforcement

If the Town determines that a project is in non-compliance with the Town’s Stormwater Management Ordinance, then the Town may direct conformity by proceeding with the appropriate enforcement action. The types of enforcement tools available to the Town include a Correction Order, Notice of Violation (NOV), Stop Work Order and/or Civil/Criminal Penalties. The enforcement mechanism to be utilized will depend on the circumstances as described in the following sections.

The Town Engineer shall issue a Correction Order for first offenses of non-compliance with the Town Ordinance, the Town Approval or the approved stormwater management plan. The purpose of the Correction Order is to give notice of the deficiencies, identify expected corrective results and provide a reasonable timeframe to the contractor prior to the Town taking further action to get a problem resolved. Correction Orders shall be submitted in writing, but a verbal notice may be given if the deficiency needs immediate correction to prevent offsite or downstream impacts. The Town Engineer shall issue Correction Orders within five (5) working days of an inspection. All Correction Orders, verbal or written, shall be noted in the project file.

Correction Orders may be issued in such cases, but not be limited to, when there is:

1. Failure to comply with the approved stormwater design plans to include failure to have properly installed and/or maintained BMP measures.

2. Failure to properly maintain permanent stormwater management structures.

3. Failure to notify the Town Engineer before beginning work on a phase of an approved project.

4. Failure to call for a final site inspection.

A Correction Order should at a minimum include, but not be limited to, the following:

1. Nature of the violation(s).

2. Proposed penalty.

3. Required corrective actions.

4. The time period for correcting the violation(s).

If a Correction Order has been previously issued and there is either subsequent non-compliance issues or failure to complete the items on the Correction Order within a specified time period, then a Notice of Violation may be issued. In addition, for violations that do not involve a safety issue or an imminent threat of serious damage to the environment and/or public or private property, a Notice of Violation may be issued for, but are not limited to, the following:

1. If construction activities have been initiated and no BMP measures are in place, or are not working to prevent sediment from leaving the site.

2. Failure to have work inspected and approved before restarting construction activities after a stoppage of work.

A Notice of Violation (NOV) should at a minimum include, but not be limited to, the following:

1. Nature of the violation(s).

2. Proposed penalty.

3. Notification that a Stop Work Order may be issued or that Approvals for the site may be suspended or revoked if there is continued non-compliance.

4. Required corrective actions.

5. The time period for correcting the violation(s).

The Town Engineer may issue a Civil Penalty if a Notice of Violation and/or Stop Work Order has not been complied with or there has not been substantial progress in complying with the Notice of Violation and/or Stop Work Order. In addition, a Civil Penalty may be issued when there are repeated, recurring violations at the same site or when there are repeated, recurring violations by the same responsible party. Violations may subject the owner/operator to Civil Penalties in accordance with the Stormwater Management Ordinance, Division 6. Each separate day of a violation constitutes a new and separate violation.

In addition to any applicable civil penalties, any person who negligently, willfully, or intentionally violates any provision of the Stormwater Management Ordinance shall be guilty of a misdemeanor and shall be punished within the jurisdictional limits of the Town’s court. The Town Engineer may issue a uniform summons citation for a violation of the Stormwater Management Ordinance in accordance with Division 6. Each day of a violation shall constitute a new and separate violation.

View State Page

Frequently Asked Questions

The owner or lessee owns the entire stormwater system, including conveyances, ponds, and other BMPs. Whoever owns any part of the system must be clearly identified before the town issues Construction Approval, and that ownership gets recorded on the final plat.

Yes. Every component of your stormwater system, including pipes, inlets, and BMPs, needs a maintenance plan covering activities and scheduling, submitted as part of your Construction Approval application. This plan needs to address both temporary construction measures and long term maintenance. AQUALIS can help property owners in Summerville put together a maintenance plan that meets this requirement.

Yes. The owner, operator, or HOA must enter into a permanent Operating and Maintenance Agreement for Stormwater Facilities with the town. This is a legal document recorded with the County Register of Deeds and described on the final plat, and it must be signed before Construction Approval is issued. You can hire a third party to actually perform the maintenance, but as the owner, you remain the one ultimately responsible for meeting the requirements.

The town performs maintenance inspections on stormwater systems and facilities throughout their useful life, checking for adherence to your submitted maintenance plan. Inspectors also conduct post construction inspections and provide a written report within 7 days of every inspection.

Yes. Town inspections don’t reduce your own responsibility to conduct self-inspections under applicable local, state, and federal stormwater requirements, including the NPDES Construction General Permit. Records of your inspections should be kept for at least 5 years and made available to the town upon request.

You’ll likely receive a Correction Order, the town’s tool for first offenses. It identifies the deficiency, the proposed penalty, the required corrective action, and a reasonable timeframe to fix the problem before the town takes further action. AQUALIS can help property owners respond quickly to a Correction Order to prevent it from escalating.

If noncompliance continues, or if the corrective items aren’t completed in time, the town can issue a Notice of Violation. This escalates further to civil penalties if the Notice of Violation or a Stop Work Order isn’t complied with, or if there isn’t substantial progress toward compliance. Civil penalties can also apply for repeated violations at the same site or by the same responsible party, with each day of violation treated as a separate offense.

Yes, in serious cases. Anyone who negligently, willfully, or intentionally violates the stormwater ordinance can be found guilty of a misdemeanor, punishable within the jurisdiction of the town’s court, with each day of violation again counted separately.

The information on this page is provided for general informational purposes only and is not legal advice. Regulations change frequently — AQUALIS makes no warranty as to the accuracy or completeness of this content, and any reliance on it is at your own risk. Consult a qualified professional or your local regulatory authority to confirm requirements applicable to your specific property.

Services Offered in Town of Summerville and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

CIPP Lining and Structural Pipe Repair in Shelby Crossings, Fla.  

AQUALIS rehabilitated failing stormwater infrastructure at a commercial property in Shelby Crossings, Florida, using CIPP lining and structural pipe repair. Three pipe runs were lined, while two collapsed sections were excavated and replaced to restore the system.

Multiphase Stormwater Infrastructure Rehabilitation in Atl. GA

AQUALIS helped an Atlanta, Georgia property owner rehabilitate aging stormwater infrastructure through a phased approach. The project addressed critical repairs while allowing the owner to plan for future stormwater improvements.

How a Hidden Pipe Failure Created a Sinkhole and Pond Erosion at a Commercial Property in Orange City, Fla. 

A hidden stormwater pipe failure caused a sinkhole and pond erosion at a commercial property in Orange City, Florida. AQUALIS identified the damage through CCTV inspection and completed pipe and pond repairs to restore the stormwater system.

Lift Station Overhaul Restores Critical Sewage Infrastructure Tacoma, Wash.

AQUALIS completed a lift station overhaul for a critical wastewater system in Tacoma, Washington. The project replaced failing pumps, piping and electrical components, restoring reliable sanitary sewer service without disrupting terminal operations.
during construction of a new bridge in fox point, wisconsin

Green Infrastructure Protects Bridges in Fox Point, Wis.

Severe erosion threatened twin bridges spanning a ravine overlooking Lake Michigan. AQUALIS combined green and gray infrastructure to stabilize the slopes and protect critical infrastructure.

Comprehensive Lift Station Overhaul Restores Sanitary Service at Industrial Facility in Mount Vernon, Wash. 

After years of continuous service, an industrial facility's sanitary lift station had reached the end of its serviceable life. AQUALIS executed a full overhaul, replacing the pumps, plumbing, controls and in-well hardware to return the station to reliable, code-compliant operation.
Muffin Monster installation

Sanitary Lift Station Grinder Installation and System Reliability Improvement in Katy, Texas

AQUALIS addressed recurring sanitary lift station failures at a retail facility in Katy, TX, by identifying the upstream solids issue driving repeated emergency callouts. The project included installation of an inline Muffin Monster grinder, controls integration and full site restoration to improve system reliability and reduce reactive maintenance.
cut pipes laying in a parking lot

Parking Lot Sinkhole Leads to Underground Pipeline Reconstruction in Springfield, Va.

A large sinkhole at a commercial property in Springfield, Virginia led to full reconstruction of the site’s underground stormwater detention system. AQUALIS managed the phased demolition, geotechnical evaluation, utility coordination and installation to restore long-term stability and performance.
new catch basin

Manhole Root Intrusion Repair and System Assessment in Miami, Fla.

Sediment buildup, buried structures and root intrusion prompted a Miami shopping center to partner with AQUALIS to inspect, clean and restore key components of its stormwater system
uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.
new riprap for a pond

Facility Pond Shoreline Stabilization Addresses Erosion in Findlay, Ohio

Years of erosion driven by fluctuating pond levels and site runoff led to shoreline damage across this distribution property. AQUALIS implemented targeted repairs to stabilize the pond and restore stormwater control.
retention pond

Fixing Pond Erosion to Restore and Improve Stormwater Function in Mebane, N.C.

The customer requested maintenance of stormwater management principles located on the property. Lack of routine preventive maintenance had caused overgrowth, leading to insufficient stormwater systems.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.