Did you receive a Notice of Violation (NOV)? Contact AQUALIS today to learn how to resolve the issue.

Back to Compliance
Illinois Local Compliance

Town of Cicero

At AQUALIS, we know Cicero's sustainable water compliance standards and manage regulator relations for our clients.

It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to Cicero and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

Last Updated 08/12/2026

STORMWATER DETENTION

Requirements

(a) A combination of stormwater detention and controlled release rates for stormwater runoff is required for all new construction, additions to existing structures or appurtenances, and any additional development or change or use which will increase the volume of stormwater runoff over that which existed prior to the proposed development. Such detention and release rate shall be calculated in accordance with the procedures accepted by the Metropolitan Water Reclamation District of Greater Chicago and from time to time amended. Each development under this article shall discharge stormwater at the specified release rate into an existing or proposed natural stormwater outlet. All plans, calculations and specifications shall be subject to the review of the town engineer and shall receive his approval prior to commencement of any construction.

(b) The release rate of stormwater runoff for new construction shall not exceed the volume of stormwater that would run off the entire subject site in its natural undeveloped state for a three-year rainfall intensity. For additions or change in use, stormwater detention will only be required for that portion of a parcel being developed and increasing the volume of stormwater runoff greater than the land in its natural, undeveloped state.

(c) The live detention storage to be provided under this article will be calculated on the basis of a 100-year frequency rainfall as published by the National Weather Service for this area and will have sufficient volume to handle the runoff for any and all durations from the parcel subject to the detention under this article.

View State Page

Frequently Asked Questions

Any new construction, addition to an existing structure, or change in use that increases the volume of stormwater runoff beyond what the site generated in its natural, undeveloped state triggers the requirement. For additions or a change in use, detention only applies to the portion of the parcel actually being developed and adding runoff, not the whole property. Every plan, calculation and specification has to go through the town engineer for approval before construction can start.

Live detention storage is sized using a 100-year frequency rainfall as published by the National Weather Service, and it has to hold enough volume to handle runoff across any duration of storm from the site. The release rate is a separate calculation: for new construction, it can’t exceed what the entire site would have shed in its natural, undeveloped state during a three-year rainfall event, using methodology set by the Metropolitan Water Reclamation District of Greater Chicago.

Every development has to discharge its stormwater at the approved release rate into an existing or proposed natural stormwater outlet, not just hold it indefinitely on-site. That outlet, along with the detention system feeding it, has to be part of the plans reviewed and approved by the town engineer before any construction work begins.

The information on this page is provided for general informational purposes only and is not legal advice. Regulations change frequently — AQUALIS makes no warranty as to the accuracy or completeness of this content, and any reliance on it is at your own risk. Consult a qualified professional or your local regulatory authority to confirm requirements applicable to your specific property.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.

Services Offered in Town of Cicero and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

Lift Station Overhaul Restores Critical Sewage Infrastructure Tacoma, Wash.

during construction of a new bridge in fox point, wisconsin

Green Infrastructure Protects Bridges in Fox Point, Wis.

Severe erosion threatened twin bridges spanning a ravine overlooking Lake Michigan. AQUALIS combined green and gray infrastructure to stabilize the slopes and protect critical infrastructure.

Comprehensive Lift Station Overhaul Restores Sanitary Service at Industrial Facility in Mount Vernon, Wash. 

After years of continuous service, an industrial facility's sanitary lift station had reached the end of its serviceable life. AQUALIS executed a full overhaul, replacing the pumps, plumbing, controls and in-well hardware to return the station to reliable, code-compliant operation.
Muffin Monster installation

Sanitary Lift Station Grinder Installation and System Reliability Improvement in Katy, Texas

AQUALIS addressed recurring sanitary lift station failures at a retail facility in Katy, TX, by identifying the upstream solids issue driving repeated emergency callouts. The project included installation of an inline Muffin Monster grinder, controls integration and full site restoration to improve system reliability and reduce reactive maintenance.
cut pipes laying in a parking lot

Parking Lot Sinkhole Leads to Underground Pipeline Reconstruction in Springfield, Va.

A large sinkhole at a commercial property in Springfield, Virginia led to full reconstruction of the site’s underground stormwater detention system. AQUALIS managed the phased demolition, geotechnical evaluation, utility coordination and installation to restore long-term stability and performance.
new catch basin

Manhole Root Intrusion Repair and System Assessment in Miami, Fla.

Sediment buildup, buried structures and root intrusion prompted a Miami shopping center to partner with AQUALIS to inspect, clean and restore key components of its stormwater system
uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.
new riprap for a pond

Facility Pond Shoreline Stabilization Addresses Erosion in Findlay, Ohio

Years of erosion driven by fluctuating pond levels and site runoff led to shoreline damage across this distribution property. AQUALIS implemented targeted repairs to stabilize the pond and restore stormwater control.
retention pond

Fixing Pond Erosion to Restore and Improve Stormwater Function in Mebane, N.C.

The customer requested maintenance of stormwater management principles located on the property. Lack of routine preventive maintenance had caused overgrowth, leading to insufficient stormwater systems.
inside of a lift station

Upgrading Failing Lift Stations to Restore Stormwater Flow in Peru, Ind.

The three lift stations on this property had not been serviced in several years and were showing signs of deterioration. The property owner contacted AQUALIS to perform a full inspection and recommend repairs to restore reliable operation and prevent future system failures.
pond after stormwater repairs

Stormwater Repairs Ensure Regulatory Compliance in Charlotte, N.C.

Learn how AQUALIS completed stormwater system restoration ahead of a compliance audit, ensuring the property met regulatory standards and was fully prepared for inspection.
AQUALIS employee removing the old valve

Gate Valve Replacement Improves Stormwater Flow Control in Durham, N.C.

Learn how AQUALIS helped a high-traffic commercial property stay in compliance by replacing a critical stormwater valve, preventing costly backups and ensuring system functionality.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.