North Carolina Local Compliance

Town of Apex

At AQUALIS, we know the Town of Apex sustainable water compliance standards and manage regulator relations for our clients.

It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to Apex, North Carolina and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

Last Updated 08/20/2026

Excerpts from APEX Town Unified Development Ordinance Section 6.1

6.1.12 Structural SCMs

A) Professional Design

All structural SCMs and any alterations thereof shall be designed by a North Carolina registered professional with qualifications appropriate for the type of system required and shall be in accordance with the NC DWQ Stormwater SCM Manual, the Town of Apex Standard Specifications and Standard Details and, when applicable, the Town of Apex Design and Development Manual; these registered professionals are defined as professional engineers, landscape architects (to the extent that G.S. Chapter 89A allows), and land surveyors (to the extent that the design represents incidental drainage within a subdivision, as provided in G.S. 89C-3(7)).

B) Design, Location, and Landscaping of Structural SCMs

The following specific design criteria shall be met by these systems:
    1. Specific requirements for structural SCMs shall be in accordance with the NC DWQ Stormwater SCM Manual and the Town of Apex Standard Specifications and Standard Details;
    1. Structural SCMs shall be designed to remove 85% of total suspended solids in the permanent pool and store runoff from a one-inch rainfall from the site above the permanent pool;
    1. The designed runoff storage volume shall be above the permanent pool;
    1. The discharge rate from these systems following the one-inch rainfall design storm shall be such that the runoff does not draw down to the permanent pool level in less than two days and that the pond is drawn down to the permanent pool level within at least five days;
  1. The mean permanent pool depth shall be a minimum of three feet;
  1. The inlet structures shall be designed to minimize turbulence using baffles or other appropriate design features;
  1. Retention basins, detention basins, headwalls, outlet structures, concrete flow channels, rip rap channels, and other drainage improvements shall be screened with plant material and/or berms and situated in the least visible location or, if visible, incorporated into the natural curves of the land;
  1. Detention and retention basin embankments and the detention or retention basin itself shall be extensively landscaped with wet tolerant plant materials with the intention of re-creating a seasonal high water wet eco-structure; a list of guidelines for preferred plant materials can be found in the NC DEQ Stormwater Design Manual;
  1. Detention or retention facilities shall be sized to accommodate the future growth of vegetation planted in the basin; and
  1. In lieu of peripheral fencing, detention and retention basin edges shall be contoured and shaped to form low angles at primary water line thereby ensuring greater pedestrian safety.
  1. All supporting calculation submittals for each proposed structural SCM shall include and comply with the latest version of the NC DWQ SCM supplement.

C) Identification on Site Plan/Subdivision Plan/Final Plat of SCM

A legal description of the area containing the SCM shall be delineated on the site plan (major or minor), subdivision plan, and recorded Final Plat along with any easements necessary for access to the SCM. The described area shall include sufficient area to perform inspections. The described area shall include, but is not limited to, the detention pond, vegetative filters, all pipes and water control structures, berms and dikes. Prior to approval of a Final Plat (with respect to a subdivision), issuance of a certificate of occupancy (with respect to a site plan), or commencement of a use, a developer shall first cause all information pertaining to required SCMs to be shown and certified by the Stormwater and Utility Engineering Manager on the Final Plat for the property. Such final, approved plat to be recorded shall also contain the following language: “All future development or redevelopment activities on this property shall be consistent with this approved plan. No changes to this plan shall be permitted without the Town of Apex’s prior written approval.” 

D) Operation and Maintenance Agreement

The owner shall have an operation and maintenance agreement for all SCMs approved by the Stormwater and Utility Engineering Manager prior to approval of a Final Plat (with respect to a subdivision) or issuance of a certificate of occupancy (with respect to a site plan) for any development upon which a SCM is required. The operation and maintenance agreement, which must be executed by the owner and shall be binding on all subsequent owners of the site, portions of the site, and lots or parcels served by the SCM, shall clearly indicate (i) what operation and maintenance actions are needed and what specific quantitative standards will be used for determining when those actions need to be taken, (ii) the steps that will be taken for restoring a SCM if a failure occurs, and (iii) how cost will be apportioned among lot owners served. The operation and maintenance agreement must be recorded in the Wake County Register of Deeds office and referenced on the Final Plat. A copy of the recorded operation and maintenance agreement shall be provided to the Stormwater and Utility Engineering Manager within 14 days following its recordation. 

E) Changes or Amendments to Plans and Specifications and/or Operation and Maintenance Agreement

Any changes or amendments to the plans and specifications of a SCM, or the operation and maintenance agreement for a SCM shall meet all of the requirements of this rule regarding design and approval.

F) Compliance Prior to Receiving Plat Approval or Certificate of Occupancy

Subject to Subsection (G) below, prior to approval of a final plat (with respect to a subdivision), issuance of a certificate of occupancy (with respect to a site plan),  or commencement of a use for any development upon which a structural SCM is required, the owner shall have installed the improvements required by this Article and shall have received the approval of the Environmental Programs Manager with respect to the improvements. Upon installation of the required improvements, the Environmental Programs Manager or his designee shall inspect the structural SCM and the owner shall demonstrate that the required structure is in place, that it is operational, that it complies with all relevant portions of Sec. 6.1.12 Structural SCMs, and shall submit to the Environmental  Programs Manager actual “as built” plans for the structure, which shall include the information listed in Article 6 Overlay Districts, and Section 1.06(c) Stormwater Drainage System of the Town of Apex Standard Specifications and Standard Details, certifying completion of the same.

G) Performance Guarantees

  1. As provided in a, b, and c below, in lieu of prior performance otherwise required by this Article, the Town may accept a performance guarantee that the improvements required by this Article will be constructed according to the Town’s specifications at the owner’s expense. Guarantees shall comply with the requirements of this Subsection G.
    1. Site plan: In lieu of performance prior to the issuance of a temporary certificate of occupancy related to a site plan, a performance guarantee may be provided by the owner guaranteeing the installation of the improvements required by this Article. Improvements guaranteed under this Subsection a. shall be constructed by the owner within one (1) year after issuance of the temporary certificate of occupancy. All improvements required by this Article related to a site plan, shall be constructed prior to the issuance of a permanent certificate of occupancy. 
    2. Phased site plan: In lieu of performance prior to the issuance of a temporary or permanent certificate of occupancy related to a phased site plan, a performance guarantee may be provided by the owner guaranteeing the installation of the improvements required by this Article for each phase. All improvements guaranteed under this Subsection b. shall be completed prior to the issuance of certificates of occupancy for 90% of the buildings within that phase, or within 60 days after receipt of written notice that the Stormwater and Utility Engineering Manager has determined that the contributing drainage area to the SCM is sufficiently stabilized to install the SCM, whichever occurs first.
    3. Subdivisions: In lieu of performance prior to approval of a Final Plat for subdivisions, a performance guarantee may be provided by the owner guaranteeing the installation of the improvements required by this Article. All improvements guaranteed under this Subsection c. shall be completed prior to the issuance of certificates of occupancy for 90% of the lots within the subdivision. If the subdivision is to be phased, all improvements within or required for each phase shall be completed prior to issuance of certificate of occupancy for 90% of the lots within that phase.
  2. Performance guarantee. Performance guarantees shall be provided by the owner in the amount equal to 125% of the total construction cost of the required SCM. The total cost of the structural SCM(s) shall include all construction costs, including but not limited to, the cost of materials, landscaping, seeding and soil stabilization, grading, excavation and fill. The owner shall submit his estimate of this amount subject to review, modification, and approval by the Stormwater and Utility Engineering Manager. Such estimate shall be signed and sealed by a licensed North Carolina professional engineer, landscape architect, or land surveyor. Guarantees required by this Section may be in the form of a surety bond enforceable at the sole discretion of the Town and in the form prescribed by the Town, a letter of credit that meets the specifications of Sec. 7.5.17 Irrevocable Letter of Credit in Lieu of Surety Bond or Other Guarantee of Performance, certified check drawn in favor of the Town, or cash deposited with the Town.
  3. Duration of performance guarantee. Performance guarantees shall run until the requirements of Sec. 6.1.12 have been satisfied and the Stormwater and Utility Engineering Manager has given final approval of the required SCM(s).
  4. Default. Failure of the owner to construct, repair, and if necessary, reconstruct the SCM(s) as required by Sec. 6.1.12 is a default. Upon such default, the Town may obtain and use all or any portion of the performance guarantee necessary to complete the improvements.
  5. Costs in excess of performance guarantee. In the event the Town calls the performance guarantee required by this Section and the reasonable cost of performance exceeds the amount of the performance guarantee the Town may collect the difference from the owner. 

H) Maintenance and Maintenance Guarantees

  1. Duty to maintain and maintenance and defects guarantee. The owner is responsible for all maintenance and repair of improvements required by this Article. In addition to the Operation and Maintenance Agreement required by Sec. 6.1.12.D, with respect to a subdivision, a maintenance and defects guarantee shall be provided by the owner in the amount equal to 25% of the total construction cost of the SCM to ensure proper maintenance and repair prior to conveyance of the improvements to a property owners association. The maintenance and defects guarantee shall be submitted to the Town of Apex prior to SCM final approval. The owner shall submit his estimate of this amount subject to review, modification, and approval by the Stormwater and Utility Engineering Manager. Such estimate shall be signed and sealed by a licensed North Carolina professional engineer, landscape architect, or land surveyor. Guarantees required by this Section may be in the form of a surety bond enforceable at the sole discretion of the Town and in the form prescribed by the Town, a letter of credit that meets the specifications of Sec. 7.5.17 Irrevocable Letter of Credit in Lieu of Surety Bond or Other Guarantee of Performance, certified check drawn in favor of the Town, or cash deposited with the Town.
  2. Duration of maintenance and defects guarantee for subdivision. The maintenance and defects guarantee shall be in effect for one (1) year after the SCM final approval date issued by the Town’s Stormwater and Utility Engineering Manager or designee.
  3. Default. Upon failure of the owner to maintain the SCM as required, the Town may obtain and use all or any portion of the maintenance and defects guarantee necessary to continue maintenance of the structure.

I) Inspection

  1. Inspect once a year. On an annual basis after completion of construction of a SCM, the owner shall submit to the Stormwater and Utility Engineering Manager an inspection report for that structure from a qualified registered North Carolina professional engineer, surveyor, or landscape architect performing services only in their area of competence. The inspection report shall be on a form provided by the Stormwater and Utility Engineering Manager. An initial inspection report shall be provided to the Stormwater and Utility Engineering Manager beginning one (1) year from the date of submittal of the certified as-built plans to the Town and each year thereafter on or before the date of the as-built certification. 
  1. Inspection by Town of Apex. All property within the Primary Watershed Protection District and/or the Secondary Watershed Protection District shall also be subject to inspection by the Stormwater and Utility Engineering Manager or his designee. Such inspections may include, but are not limited to, reviewing maintenance and repair records, sampling discharges, surface water, groundwater, and material or water in SCMs, and evaluating the condition of SCMs.
  1. Corrective action. If at any time the Town of Apex determines that corrective actions or improvements to a SCM are required, the Town of Apex shall notify the owner of the needed corrections and of the date by which the work is to be completed. All corrective work shall be consistent with the approved operation and maintenance agreement. 
  1. Authorization prior to repair or reconstruction of structure. With the exception of general landscaping and grounds maintenance, the owner of the SCM shall obtain authorization from the Town prior to any repair or reconstruction of the structure. All improvements and repairs shall be consistent with the approved maintenance and operation agreement. In a bona fide emergency, necessary measures may be taken immediately in order to minimize damage to the structure and ensure its continued operation. Such measures must be promptly reported to the Stormwater and Utility Engineering Manager.

View State Page

Frequently Asked Questions

Post-construction stormwater management covers the ongoing responsibility to maintain stormwater control measures, or SCMs, and open space areas on your property according to its approved stormwater control plan. In Apex, the property owner bears full responsibility for all maintenance and repair of these improvements, not the Town, for as long as the property is owned. AQUALIS provides full post-construction stormwater management for property owners across Apex, so SCMs stay compliant well after a project is finished.

Apex requires structural SCMs to remove 85 percent of total suspended solids and to handle the runoff generated by a one-inch rainfall event, with discharge rates controlled so the permanent pool cannot draw down in less than two days, and must fully draw down within five days. These are the standards a functioning system was designed to meet, and they are also the standards an Apex property owner is expected to keep it meeting over time. AQUALIS manages ongoing SCM performance for Apex property owners, so systems continue operating within these required parameters.

Apex requires an annual inspection report submitted to the Stormwater and Utility Engineering Manager after SCM construction is complete, prepared by a qualified North Carolina professional, and the Town also conducts its own inspections, which can include reviewing maintenance and repair records and sampling discharges, surface water, and groundwater. Missing this annual filing puts an Apex property at risk of falling out of compliance. AQUALIS coordinates these annual qualified inspections for Apex property owners and manages the reporting so nothing is missed.

Before a certificate of occupancy or plat approval is issued in Apex, the property owner must execute a recorded Operation and Maintenance Agreement that specifies the maintenance actions required, quantitative performance standards, the steps to restore the system if it fails, and how costs are allocated among any properties that share and benefit from the SCM. If you are unsure what agreement is recorded against your Apex property, AQUALIS can review it, confirm your obligations, and take on the maintenance activity it requires.

Yes, in most cases. Apex requires a performance guarantee equal to 125 percent of the total construction costs, covering materials, landscaping, grading, and excavation, and for subdivisions, a separate maintenance guarantee equal to 25 percent of construction costs that remains valid for one year after approval. These financial obligations are easy to lose track of once a project is well past construction. AQUALIS helps Apex property owners understand what guarantees are still tied to their site and keeps maintenance on track so those funds are used as intended.

Apex has NPDES authority to inspect properties and issue a notice of violation for noncompliance if a required SCM is not being maintained and repaired as the owner’s agreement specifies. Since the property owner bears full responsibility for these improvements under the Town’s ordinance, there is no fallback if maintenance is neglected. AQUALIS provides non-compliance resolution for Apex property owners, correcting SCM issues before they escalate into a notice of violation.

Because Operation and Maintenance Agreements in Apex are recorded and tied to the property rather than a specific owner, the maintenance obligation and annual inspection reporting requirement transfer automatically when the property is sold. New owners are often unaware of this until the Town’s Stormwater and Utility Engineering Manager reaches out about an overdue report. AQUALIS reviews the maintenance and inspection history for newly acquired Apex properties and takes over the ongoing responsibility from there.

Post-construction stormwater compliance in Apex involves a recorded Operation and Maintenance Agreement, annual qualified inspections, performance and maintenance guarantees, and full owner responsibility for repairs, with the risk of a notice of violation if any part of it is neglected. Managing all of this without dedicated stormwater staff is difficult for most property owners. AQUALIS offers complete post-construction stormwater management for Apex property owners, covering maintenance, annual inspection coordination, guarantee tracking, and non-compliance resolution, so owners can meet the Town’s requirements without managing the process themselves.

The information on this page is provided for general informational purposes only and is not legal advice. Regulations change frequently — AQUALIS makes no warranty as to the accuracy or completeness of this content, and any reliance on it is at your own risk. Consult a qualified professional or your local regulatory authority to confirm requirements applicable to your specific property.

Services Offered in Town of Apex and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.
retention pond

Fixing Pond Erosion to Restore and Improve Stormwater Function in Mebane, N.C.

The customer requested maintenance of stormwater management principles located on the property. Lack of routine preventive maintenance had caused overgrowth, leading to insufficient stormwater systems.
pond after stormwater repairs

Stormwater Repairs Ensure Regulatory Compliance in Charlotte, N.C.

Learn how AQUALIS completed stormwater system restoration ahead of a compliance audit, ensuring the property met regulatory standards and was fully prepared for inspection.
AQUALIS employee removing the old valve

Gate Valve Replacement Improves Stormwater Flow Control in Durham, N.C.

Learn how AQUALIS helped a high-traffic commercial property stay in compliance by replacing a critical stormwater valve, preventing costly backups and ensuring system functionality.
tape measurer in underground detention system

Restoring Underground Detention Systems to Prevent Flooding in Morrisville, N.C.

AQUALIS restored stormwater systems at a restaurant after city inspections revealed deficiencies. The team ensured proper drainage, improved water quality and regulatory compliance.
open manhole

From Stormwater Inspection to Full System Restoration in Morrisville, N.C.

By sealing structural damage, restoring filtration, and performing thorough cleaning, the team ensured compliance, improved water quality and prevented costly future failures.

Stormwater Pipe Inspection Reveals Systemwide Failures in Durham, N.C.

The property owners on this site noted cracking and shifting along the edge of the parking lot near stormwater assets. Understanding the gravity of the situation, they reached out to AQUALIS to conduct a preliminary inspection of the stormwater system.
excavators on the side of a hill

Sinkhole Leads to Stormwater System Repair in Durham, N.C.

The tenant on this property noticed a depression that opened to the ground below and notified the property owners.
Two Sinkholes

Sinkhole Restoration and Stormwater Repairs in Raleigh, N.C.

Sinkholes appeared in the drive lane of this complex. AQUALIS was called to investigate.
Cleared Retention Pond

Wet Detention Basin Restoration Improves Performance in Fayetteville, N.C.

A store in Fayetteville, NC provides the community with excellent customer service, and durable and long-lasting products that will hold their value for years to come.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.