It is our mission to help you become compliant with these stormwater, wastewater and drinking water regulations through inspections, maintenance, repairs and rehabilitation services. As your water compliance provider, we handle the regulatory guidelines specific to Salt Lake City, Utah and ensure that our services meet the highest compliant procedures to keep you in compliance with local regulators.

Last Updated 07/27/2026

SALT LAKE CITY STORM WATER MANAGEMENT PLAN

7.0 LONG-TERM STORM WATER MANAGEMENT IN NEW DEVELOPMENT AND REDEVELOPMENT (POST-CONSTRUCTION STORM WATER MANAGEMENT)

New development and redevelopment areas can impact storm water quality because of increased runoff and resulting higher flow velocities. The Long-Term Storm Water Management in New Development and Redevelopment Program addresses post construction storm water runoff to the MS4 from new development and redevelopment construction sites disturbing greater than or equal to one acre, including projects less than one acre that are part of a common plan of development or sale with the intent to control flow and improve water quality by requiring post construction storm water controls to limit the discharge rate to mirror the pre-development hydrology of the previously undeveloped site.

7.1 DESCRIPTIONS & BMPs

Salt Lake City will address long-term storm water management in accordance with the Construction Site Storm Water Runoff Control Program by employing the following major components:

• an ordinance and other regulatory mechanisms requiring post-construction controls (4.2.5.1. & 4.2.5.2.)
• plan review for new development and redevelopment sites, with requirements for detention, retention, and use of GI and LID practices, where able (4.2.5.3.)
• an inspection and enforcement program to ensure proper installation and ongoing maintenance, which includes an incentive program for proper maintenance (4.2.5.2. & 4.2.5.4.)
• an inventory and mapping of post-construction storm water controls (4.2.5.4.)
• and a training program for applicable personnel (4.2.5.5.)

Progress towards measurable goals will be detailed in the Annual Report

7.1.3 LONG-TERM STORM WATER MANAGEMENT INSPECTION AND ENFORCEMENT

Objective: Inspect long-term storm water management measures to ensure adequate long-term operation and maintenance.

Description: Continue to inspect post-construction storm water management measures, enforce against violations of ordinance, and implementation of SOPs. The following BMPs and procedures have been designed to meet 2021 Permit requirements for this program component, and will continue to be implemented

Permit Requirement: Part 4.2.5.2., 4.2.5.2.3., 4.2.5.2.4., 4.2.5.2.5., 4.2.5.2.6., & 4.2.5.4.2. – Long-term Stormwater Management in New Development and Redevelopment

Long-term Storm Water Management Inspections (Permit Requirement 4.2.5.2., 4.2.5.2.3., 4.2.5.2.4., 4.2.5.2.5. & 4.2.5.2.6.): The City shall continue to inspect all applicable permanent structural BMPs at least once during installation and once after completion, then once every five years thereafter. Inspections and records will continue to be documented and maintained. Inspections shall include the following documentation:

  • Inspection Date
  • Name and signature of inspector
  • Project location
  • Current owner information
  • A description of the condition of the storm water control measure including the quality of: vegetation and soils; inlet and outlet channel structures; catch basins; spillways; weirs, and
    other control structures; and sediment and debris accumulation in storage as well as in and around inlet and outlet structures; and
  • Specific maintenance issues or violations found that need to be corrected by the property owner or operator along with deadlines and reinspection dates.

Ordinance Provision for Inspections on Private Property (Permit Requirement 4.2.5.2., 4.2.5.2.4): Title 17, Chapter 17.84.500 – Inspection Right of Entry, grants legal authority for the City to be
allowed access to applicable sites during construction and post-construction phases for inspections of long-term storm water BMPs as outlined in the ordinance.

Long-Term Storm Water Management Enforcement (Permit Requirement 4.2.5.2.1., 4.2.5.2.3., 4.2.5.2.4., 4.2.5.2.5. & 4.2.5.2.6.): Title 17, Chapter 17.87, addresses violations in the ordinance to
any long-storm water management issues that may adversely affect storm water quality. Enforcement of violations may also include the removal of any storm water impact fee discount the owner/operator may be receiving as part of the post-construction incentive program.

Inspection and Enforcement SOPs (Permit Requirement 4.2.5.5): Salt Lake City will continue to revise and implement an SOP that details the inspection and enforcement process for Long-Term
Storm Water Management.

7.1.6 LONG-TERM STORM WATER BMP INVENTORY

Objective: Maintain an inventory of post-construction structural storm water control measures.
Permit Requirement: Part 4.2.5.4., 4.2.5.4.1. & 4.2.5.4.2. – Long-term Storm water Management in New Development and Redevelopment
Description: Salt Lake City will continue to maintain an inventory of all public and private long-term storm water control measures installed and implemented at sites that disturb greater than or equal to 1- acre, including projects less than 1-acre that are part of a common plan of development or sale disturbing at least 1-acre of land. The City will update this inventory as necessary, per inspections. The inventory will include the following information:


• Project name;
• Owner name and contact information;
• Location;
• Start and end date;
• Description of each storm water control measure/BMP (type, number, design or performance specifications);
• Description of inspection and maintenance requirements (frequency of required maintenance and inspections); and
• Inspection information (date, findings, follow-up activities, prioritization of follow-up activities, compliance status).

View State Page

Frequently Asked Questions

Stormwater compliance in Salt Lake City means following the City’s stormwater ordinance and its Long-Term Storm Water Management Program, which governs post-construction stormwater runoff from new development and redevelopment sites. The program applies to construction projects disturbing one acre or more, and to projects disturbing less than one acre that are part of a larger common plan of development or sale that in total disturbs at least one acre.

The goal is to control flow and improve water quality by requiring post-construction stormwater controls designed to limit discharge rates to mirror the pre-development hydrology of the site. Property owners are responsible for the ongoing maintenance of those controls, and the City actively inspects private stormwater facilities and enforces against violations of the ordinance.

Property owners and operators are responsible for the maintenance of all permanent structural stormwater BMPs on their property. Salt Lake City maintains a formal inventory of all public and private long-term stormwater control measures installed at qualifying sites, which includes owner contact information, BMP type and design specifications, and inspection and maintenance requirements for each facility.

Being in the City’s inventory means your facility is subject to periodic inspections. If you are unsure whether your property is in the inventory or what maintenance requirements apply to your specific BMP, AQUALIS can help you confirm your compliance status and establish a maintenance program.

Salt Lake City inspects all applicable permanent structural BMPs at least once during installation and once after construction is complete, then at minimum once every five years thereafter. Each inspection is documented and maintained in the City’s records and must include the inspection date, the name and signature of the inspector, the project location, current owner information, a description of the condition of the stormwater control measure including vegetation and soils, inlet and outlet structures, catch basins, spillways, weirs, and sediment accumulation, and any specific maintenance issues or violations found along with deadlines and reinspection dates.

If violations are identified, enforcement can include removal of any storm water impact fee discount the owner or operator may be receiving through the City’s post-construction incentive program. AQUALIS recommends conducting your own inspection before the City’s five year review so deficiencies are identified and addressed in advance.

Watch for these warning signs.

Your project disturbed one acre or more and you are unsure whether post-construction controls were required or installed. Salt Lake City’s program applies to all qualifying development and redevelopment sites. If controls were required but not properly installed or documented, that is an active compliance gap the City can act on during an inspection.

Your facility is in the City’s BMP inventory but has not been maintained. The City tracks all private stormwater facilities subject to its program. If your property is in the inventory and the facility is in poor condition, a scheduled inspection could result in a violation finding and loss of any fee discounts.

Water is not draining or ponding persists after rain. A post-construction BMP that cannot manage runoff as designed is not meeting the City’s performance standards and will likely be identified as a maintenance deficiency during the next inspection.

Visible sediment buildup, clogged inlets or outlets, or deteriorated vegetation. These are all specifically documented during City inspections. Addressing them proactively is far preferable to receiving a notice with a correction deadline and reinspection date.

Recent property purchase. Post-construction stormwater obligations stay with the property. If you recently acquired a commercial property and are unsure what BMPs are on site or whether they are in the City’s inventory, an AQUALIS assessment can clarify your obligations before the City’s next inspection.

The information on this page is provided for general informational purposes only and is not legal advice. Regulations change frequently — AQUALIS makes no warranty as to the accuracy or completeness of this content, and any reliance on it is at your own risk. Consult a qualified professional or your local regulatory authority to confirm requirements applicable to your specific property.

Services Offered in City of Salt Lake City and Surrounding Area

retention pond and grass shore

Stormwater Management

AQUALIS provides comprehensive stormwater services across the United States. From inspection and maintenance to repairs and rehabilitations, AQUALIS manages water on your property so you do not have to.
lift station

Wastewater Management

AQUALIS offers sustainable wastewater solutions including inspection, maintenance and repairs.
Three people reviewing plans

Sustainable Water Engineering

AQUALIS provides sustainable engineering services, in states in which we are licensed, from concept through construction, working closely with our clients to identify and deliver their ideal solutions.
storm drain

Monitoring & Reporting

There are multiple requirements and records that need to be kept from your SWPPP to inspections and depending on your industry, stormwater sampling and analysis.
person holding a beaker

Water Quality Testing

AQUALIS offers water quality testing for stormwater, wastewater and drinking water.

Case Studies

From Diagnosis to Repair: How AQUALIS Solved a Repeat Erosion Problem No One Else Could in Wilmington, NC

With proper evaluation, AQUALIS developed a new engineering solution and performed a repair, serving as the single point of contact from diagnosis through construction.

Storm Pipe Repair and Rehabilitation in Delray Beach, Fla. 

A sinkhole in a Delray Beach roadway exposed a major failure in a 36-inch storm pipe. AQUALIS uncovered the pipe, identified an unexpected utility-related break and used a custom concrete repair to restore the stormwater system without replacing the otherwise sound pipe.

CIPP Lining and Structural Pipe Repair in Sebring, Fla.  

AQUALIS rehabilitated failing stormwater infrastructure at a commercial property in Sebring, Florida, using CIPP lining and structural pipe repair. Three pipe runs were lined, while two collapsed sections were excavated and replaced to restore the system.

Multiphase Stormwater Infrastructure Rehabilitation in Atl. GA

AQUALIS helped an Atlanta, Georgia property owner rehabilitate aging stormwater infrastructure through a phased approach. The project addressed critical repairs while allowing the owner to plan for future stormwater improvements.

How a Hidden Pipe Failure Created a Sinkhole and Pond Erosion at a Commercial Property in Orange City, Fla. 

A hidden stormwater pipe failure caused a sinkhole and pond erosion at a commercial property in Orange City, Florida. AQUALIS identified the damage through CCTV inspection and completed pipe and pond repairs to restore the stormwater system.

Lift Station Overhaul Restores Critical Sewage Infrastructure Tacoma, Wash.

AQUALIS completed a lift station overhaul for a critical wastewater system in Tacoma, Washington. The project replaced failing pumps, piping and electrical components, restoring reliable sanitary sewer service without disrupting terminal operations.
during construction of a new bridge in fox point, wisconsin

Green Infrastructure Protects Bridges in Fox Point, Wis.

Severe erosion threatened twin bridges spanning a ravine overlooking Lake Michigan. AQUALIS combined green and gray infrastructure to stabilize the slopes and protect critical infrastructure.

Comprehensive Lift Station Overhaul Restores Sanitary Service at Industrial Facility in Mount Vernon, Wash. 

After years of continuous service, an industrial facility's sanitary lift station had reached the end of its serviceable life. AQUALIS executed a full overhaul, replacing the pumps, plumbing, controls and in-well hardware to return the station to reliable, code-compliant operation.
Muffin Monster installation

Sanitary Lift Station Grinder Installation and System Reliability Improvement in Katy, Texas

AQUALIS addressed recurring sanitary lift station failures at a retail facility in Katy, TX, by identifying the upstream solids issue driving repeated emergency callouts. The project included installation of an inline Muffin Monster grinder, controls integration and full site restoration to improve system reliability and reduce reactive maintenance.
cut pipes laying in a parking lot

Parking Lot Sinkhole Leads to Underground Pipeline Reconstruction in Springfield, Va.

A large sinkhole at a commercial property in Springfield, Virginia led to full reconstruction of the site’s underground stormwater detention system. AQUALIS managed the phased demolition, geotechnical evaluation, utility coordination and installation to restore long-term stability and performance.
new catch basin

Manhole Root Intrusion Repair and System Assessment in Miami, Fla.

Sediment buildup, buried structures and root intrusion prompted a Miami shopping center to partner with AQUALIS to inspect, clean and restore key components of its stormwater system
uv light entering pipe

How Stormwater Pipe Inspection & UV Rehabilitation Restored Flow in New Bern, N.C.

A facility relies on an underground stormwater system to move runoff to a nearby retention basin. A 36-inch pipe plays a key role, but concerns emerged as flooding occurred during heavier rainfall.

Did you receive an NOV? Have an urgent need? We can help.

Notices of Violation (NOVs) or Corrective Notices should be taken seriously. Contact AQUALIS today to learn how to resolve the issue and comply with regulations.